CDM Contractor / PC Information Form — Parallel Architecture
Construction (Design and Management) Regulations 2015 · parallelarchitecture.co.uk/cdm-contractor-form
1. Project Reference & Company Details
This form is completed by the Principal Contractor (or main or specialist contractor) for this project. Your answers are used to populate the Pre-Construction Information and CDM documentation. Please use the project reference provided by Parallel Architecture.
Company Details
Contact Details
Please fill in the project reference, your role, company name, contact name and email before continuing.
2. Role, Appointment & Competence
Duty Acknowledgement
Appointment Status
Competence
The Principal Designer records competence information provided by contractors and makes it available for the Client's review. The Client remains responsible for taking reasonable steps to appoint duty holders with suitable skills, knowledge, experience and organisational capability under CDM 2015.
Insurance
Upload competence & insurance evidence
Accepted: PDF, Word, Excel, image. Max 35 MB total. You can also email documents separately to cdm@parallelarchitecture.co.uk with your project reference.
3. Design Information Review & Outstanding Information
Before construction starts, the Principal Contractor must review the design information and pre-construction information made available for the project. Please complete this section after reviewing the current design information, PCI, DRA, RRR and any issued surveys or reports. This section records whether you have received enough information to prepare the Construction Phase Plan and safely plan the works, and identifies what is still required.
Part A — Design information received
For each item, confirm its current status. Where information has been received, note the document reference, confirm whether it is the current revision, and flag any concerns. Where information has not been received, this will generate an action in the CDM tracker.
Part B — Information still required before works can proceed safely
Tick any information you still need before you can prepare the CPP or safely plan and start the works. For each item, confirm what is needed, who should provide it, whether it has been requested, and what it is blocking.
4. Construction Phase Plan
The Principal Contractor must prepare a Construction Phase Plan (CPP) before the construction phase begins. The Client must ensure that a CPP has been prepared before works start. The CDM Principal Designer may review and comment on the CPP where instructed, but the Principal Contractor remains responsible for its suitability, implementation and revision throughout the construction phase.
Upload Construction Phase Plan (if prepared)
Accepted: PDF, Word, Excel, image. Max 35 MB total. You can also email documents separately to cdm@parallelarchitecture.co.uk with your project reference.
5. Site Management, Welfare & Logistics
Welfare Arrangements
The Principal Contractor is responsible for providing and maintaining suitable welfare facilities throughout the construction phase (CDM 2015 Schedule 2).
Occupied Premises & Public Segregation
Site Induction & Rules
Site Logistics
6. Safety Procedures & Key Construction Risks
Asbestos
A Refurbishment and Demolition (R&D) asbestos survey is required before any intrusive works on a pre-2000 building.
Temporary Works
For significant temporary works, suitable temporary works procedures should be in place, including a named Temporary Works Coordinator where required, in accordance with relevant good practice such as BS 5975.
Scaffold & Access at Height
Fire & Hot Works
Dust, Noise & Vibration
Excavation & Groundworks Safety
Services Isolation
Emergency Arrangements
Upload RAMS, risk assessments & safety documents
Accepted: PDF, Word, Excel, image. Max 35 MB total. You can also email documents separately to cdm@parallelarchitecture.co.uk with your project reference.
7. Contractor Design Responsibility & Subcontractor Management
Contractor-as-Designer
You may be acting as a Designer under CDM 2015 if you prepare, modify, arrange or instruct design information — including substitutions, value-engineering proposals, changed details on site, temporary works proposals, scaffold and access design, contractor-designed portions (CDP), specialist subcontractor design, changes to materials, build-ups or support details, or deviations from architect or engineer drawings. Designer duties apply in addition to your contractor duties.
Subcontractor Management
8. Health & Safety File Contributions
The H&S File is handed to the Client at practical completion. It records information that future occupiers, maintenance contractors and future designers will need. Please confirm what information your company will contribute.
9. Start-on-Site Readiness & CDM Principal Designer Handover Position
Start-on-Site Readiness Statement
Based on the design and CDM information currently available, please confirm your start-on-site position. This statement applies to the current design information and documents listed in Section 3. This does not constitute approval by the Principal Designer — the Principal Contractor is responsible for not starting construction until the CPP is prepared and sufficient information is in place.
CDM Principal Designer — Post-Start Arrangement
Important — please read carefully. The CDM Principal Designer's base appointment with Parallel Architecture concludes at the handover of pre-construction documents. If design work continues during the construction phase, the Client must ensure that it is undertaken and coordinated by competent persons. Where a CDM Principal Designer remains required for ongoing design coordination, the Client must retain Parallel Architecture, appoint another competent CDM Principal Designer, or appoint a competent replacement party in writing.
10. Declaration
Please read and confirm each item before generating your submission.
Please tick all six declarations and enter your name and date before generating.
↑
Submitting to Parallel Architecture…
Please wait — do not close this page.
If the submission above didn’t work, use one of these alternatives
Opens your email client with your responses pre-filled.
▼ Email client didn’t open? Manual copy instructions
Section 1 of 10
Need help?
Email: cdm@parallelarchitecture.co.uk
Phone: Robbie — 07538 103 160
If you have any questions or problems completing this form, please get in touch.