Parallel Architecture — Internal Use Only
CDM Site Visit Record
PD observations — Stage 1b · Visual inspection only
1 Project reference
2 Site access and surroundings
3 Existing building observations
Include all floors. Basement counts as a storey.
"Not apparent" = no visible evidence from this visit only.
4 Hazardous materials indicators
Textured coatings (Artex), insulating board, pipe lagging, pre-2000 roof sheets, ceiling tiles
Pre-1970 building, chalking or peeling paint, paintwork to be disturbed
5 Services observations
6 Site constraints
7 Surveys and investigations status
"Already held" means you have seen or been sent the document.
| Survey / document | Status | Notes |
|---|---|---|
| Asbestos R&D survey |
|
|
| Structural survey or condition report |
|
|
| Ground investigation report |
|
|
| Drainage survey or CCTV |
|
|
| Party wall survey(s) |
|
8 PD observations and notes
9 Photography
Tick each shot taken and select the file where prompted. Photo filenames are recorded in the submission payload. File all photos to 03-Site-Visit/ after the visit. If you have difficulty attaching photos here, you can email them separately to cdm@parallelarchitecture.co.uk with your project reference in the subject line.
10 Confirmation
I confirm that these observations were made on site on the date stated above and represent my professional assessment based on a visual inspection only. This form does not constitute a full structural, hazardous materials, or services survey. Observations are recorded as part of the CDM Principal Designer's information-gathering duties under CDM 2015.
✓ Ready to submit
Photos attached in Section 9 will be submitted automatically. Max 35 MB total.
Opens your email client — attach photos manually if needed.