Who do you need on your project, and when?

Who your project needs, when each is active, and the waiting periods set by law.

What is the project?
Is the building listed, or in a conservation area?

Historic England's National Heritage List shows listed buildings. The council's website maps its conservation areas.

Why this matters
A listed building is on the national list of buildings of special architectural or historic interest. Work that would affect its character, inside or out, needs listed building consent (Planning (Listed Buildings and Conservation Areas) Act 1990, section 7). In a conservation area, less can be built without a planning application, because the rights to build without one, called permitted development, are narrower there.
Will the work remove or open up any load-bearing walls?

A load-bearing wall carries the floors or roof above. A new opening in one counts.

Why this matters
Taking out or opening up a load-bearing wall needs a beam and its supports designed, usually by a structural engineer, and building control will ask for the calculations.
Does the Party Wall Act apply to any of the work?

It covers a new wall on the boundary, work to a party wall, and excavation near a neighbour's building.

Why this matters
A party wall is a wall shared with a neighbouring building. The Act covers a new wall at the line of junction, the boundary line (section 1); work to a party wall or other party structure (section 2); and adjacent excavation, within 3 metres of a neighbour's building to below the bottom of its foundations, or within 6 metres where the excavation meets a line drawn down at 45 degrees from the bottom of its foundations (section 6). Each needs notice to the adjoining owner (Party Wall etc. Act 1996, sections 1, 3 and 6). The party wall checker works through it.
Will more than one contractor work on the project?

A contractor is any business that carries out, manages or controls building work on site.

Why this matters
With more than one contractor, the client must appoint in writing a principal designer and a principal contractor under the Construction (Design and Management) Regulations 2015 (regulation 5(1)), and again under the Building Regulations 2010 (regulation 11D(1)). The principal designer under CDM 2015 plans, manages and monitors health and safety in the pre-construction phase; the principal designer under the Building Regulations plans, manages and monitors design work for compliance with them. They are separate appointments: one organisation can hold both only if appointed to both and competent for both.
Do you want a contract administrator?

The contract administrator administers the building contract: instructions, valuations and certificates.

Why this matters
It is a choice, not a legal requirement. Some building contracts provide for a contract administrator and some, such as JCT's contract for a home owner with no consultant, do not.
Roughly what is the construction budget?

The amount for the building work itself, excluding professional fees, surveys and loose furniture.

Does a lender, grant or funder need stages of the work certified?

About this tool

Answer eight questions about the work. The map sorts twelve roles into needed, likely and may not be needed, draws who is active at each stage of the RIBA Plan of Work 2020, and lists the waiting periods the law sets. It does not guess how long design or building will take.

Jurisdiction
England
Law checked
29 September 2026
Tool version
1.1

Made and maintained by Parallel Architecture, a director-led architectural design practice working from Bristol and Brighton. Each rule is checked against the legislation itself and cited where it is applied. How we write the guides and tools.

General guidance on the law in England from the answers you enter, not advice on your project. Website terms.

What this map is doing

It works through the roles in the order a project meets them, then places them on the stages of a project, as the RIBA Plan of Work 2020 names them.

  1. Design comes first. Every project needs a designer, or a lead designer where there are several, because it needs drawings to gain approvals and to be priced, whoever produces them.
  2. Existing buildings are measured before they are redesigned, so every project except a new house is marked likely to need a measured survey, an accurate drawing of the building as it is now. A new house starts from a survey of the site.
  3. Structure: a second storey, a loft floor, a basement, a new house, or a new opening in a load-bearing wall needs its structure designed by a structural engineer, which building control will ask to see.
  4. Permissions: whether planning permission is needed depends on the work and on what can be built without a planning application, which the law calls permitted development and which is narrower in a conservation area. A listed building needs listed building consent for any work that would affect its character (Planning (Listed Buildings and Conservation Areas) Act 1990, section 7). Anything that counts as building work needs building control, the council or a registered building control approver, which checks the work against the Building Regulations (Building Regulations 2010, regulation 3(1)).
  5. Neighbours: a new wall at the line of junction, the boundary line, work to a party wall, or an excavation within 3 or 6 metres of a neighbour's building needs notice (Party Wall etc. Act 1996, sections 1, 3 and 6). Party wall surveyors are appointed only where a dispute arises, or is deemed to arise (section 10).
  6. More than one contractor: the client must appoint in writing a principal designer and a principal contractor under the CDM Regulations 2015, the health and safety rules for building work (regulation 5(1)), and again under the Building Regulations (Building Regulations 2010, regulation 11D(1)). The principal designer (CDM 2015) plans, manages and monitors health and safety in the pre-construction phase; the principal designer (Building Regulations) plans, manages and monitors design work for compliance with the Building Regulations. They are separate appointments. One person can hold both if appointed to both and competent for both, and the client can certify in writing that the CDM principal designer holds the Building Regulations role (regulation 11D(2)). For the CDM 2015 role, ClearCDM's principal designer checker works through the detail.
  7. Cost and contract: a quantity surveyor, who advises on cost, and a contract administrator, who administers the building contract, are choices, not legal requirements. The map marks them likely as the construction budget rises, when a funder wants stages certified, or when you want a contract administrator.
  8. Stages: each role is placed on the eight stages of a project, from deciding whether to build (stage 0, Strategic Definition) to using the building (stage 7, Use), as the RIBA Plan of Work 2020 names them. The stage map is our own summary of a common pattern for small projects; yours may differ.
  9. Time: the map lists only periods set by law. The council has 8 weeks to decide a planning application or a listed building consent application (DMPO 2015, article 34(2); Listed Buildings Regulations 1990, regulation 3(4)), 8 weeks for a lawful development certificate, its written confirmation that the work is allowed without a planning application (article 39(10)), and 42 days for its approval of a larger single-storey rear extension built without a planning application, called prior approval (GPDO 2015, Schedule 2, Part 1, paragraph A.4(10)(c)). A council has 5 weeks to decide an application for building control approval with full drawings, called a full plans application, or a longer period agreed in writing (Building Regulations 2010, regulation 14A(6)). gov.uk still gives a two-month limit, which came from a section of the Building Act 1984 that stopped applying in England on 1 October 2023 (section 16). Whichever way you deal with building control, work may start once two days have passed after the day notice is given, not counting weekends and bank or public holidays (regulations 16(1) and 2). How long design, getting prices from builders and building take varies with each project, so it is not shown. Parallel will publish typical durations from its own projects.

Sources

  1. Building Regulations 2010, regulations 2, 3, 11D, 14A and 16 legislation.gov.uk
  2. Construction (Design and Management) Regulations 2015, regulation 5 legislation.gov.uk
  3. Party Wall etc. Act 1996, sections 1, 3, 6 and 10 legislation.gov.uk
  4. Planning (Listed Buildings and Conservation Areas) Act 1990, section 7 legislation.gov.uk
  5. Planning (Listed Buildings and Conservation Areas) Regulations 1990, regulation 3(4) legislation.gov.uk
  6. Town and Country Planning (Development Management Procedure) (England) Order 2015, articles 34(2) and 39(10) legislation.gov.uk
  7. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraphs A.1(g) and A.4 legislation.gov.uk
  8. RIBA Plan of Work 2020 riba.org
  9. ClearCDM: do I need a principal designer? clearcdm.co.uk

Key rules

The roles a building project in England may need, and the periods the law sets. Where each role sits on the stages is a common pattern for small projects, not a rule.

  • The RIBA Plan of Work 2020 names eight stages: 0 Strategic Definition, 1 Preparation and Briefing, 2 Concept Design, 3 Spatial Coordination, 4 Technical Design, 5 Manufacturing and Construction, 6 Handover and 7 Use.
  • Erecting or extending a building is building work under the Building Regulations 2010, so it needs building control: the council or a registered building control approver (regulation 3(1)).
  • Where more than one contractor will work on a project, the client must appoint a principal designer and a principal contractor in writing under the Construction (Design and Management) Regulations 2015 (regulation 5(1)).
  • Where more than one contractor will work on a project, the client must also appoint a principal designer and a principal contractor in writing under the Building Regulations 2010 (regulation 11D(1)).
  • The principal designer under CDM 2015 plans, manages and monitors health and safety in the pre-construction phase; the principal designer under the Building Regulations plans, manages and monitors design work for compliance with the Building Regulations. They are separate appointments.
  • One person can hold both principal designer roles if appointed to both and competent for both; under the Building Regulations the client can certify in writing that the CDM principal designer holds the role (regulation 11D(2)).
  • With one contractor, no principal designer appointment is required, but under the Building Regulations the designer, or a lead designer the designers agree in writing, carries out the principal designer duties (regulation 11D(7)), and the contractor carries the principal contractor duties (regulation 11D(6)).
  • Work that would affect the character of a listed building, inside or out, needs listed building consent (Planning (Listed Buildings and Conservation Areas) Act 1990, section 7).
  • A council has 8 weeks to decide a householder planning application, from the day after it receives a valid application, or longer if agreed in writing (DMPO 2015, article 34(2)).
  • A council has 8 weeks to decide an application for a lawful development certificate (DMPO 2015, article 39(10)(a)).
  • A council has 42 days to decide prior approval for a larger single-storey rear extension (GPDO 2015, Schedule 2, Part 1, paragraph A.4(10)(c)).
  • A council has 5 weeks to decide a full plans application for building control approval, or a longer period agreed in writing (Building Regulations 2010, regulation 14A(6)).
  • Building work may start once two days have passed after the day notice is given to building control, not counting weekends and bank or public holidays (regulations 16(1) and 2).
  • A party structure notice needs at least two months; a line of junction notice and a notice of adjacent excavation need at least one month (Party Wall etc. Act 1996, sections 1, 3 and 6). Party wall surveyors are appointed only where a dispute arises or is deemed to arise (section 10).
  • A quantity surveyor and a contract administrator are choices, not legal requirements.