Can you build it without planning permission?
Tests an extension, loft, porch or outbuilding against the permitted development limits of Classes A to G and AA.
About this tool
Describe your house and what you want to build. The checker tests it against each permitted development limit, the national limits for building without a planning application, shows which pass and which fail, draws your project against them to scale, and says how to get certainty. You are only asked the questions that apply to your project.
- Jurisdiction
- England
- Law checked
- 29 September 2026
- Tool version
- 1.1
Made and maintained by Parallel Architecture, a director-led architectural design practice working from Bristol and Brighton. Each rule is checked against the legislation itself and cited where it is applied. How we write the guides and tools.
General guidance on the law in England from the answers you enter, not advice on your project. Website terms.
What this checker is doing
It follows the national rules for what can be built on a house without a planning application, called permitted development: Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015, Classes A to G and AA.
- It stops at flats and maisonettes, because permitted development rights under Part 1 belong to houses only.
- It asks whether the house was created under permitted development, by a change of use under Part 3 or built under Part 20, because such houses do not have these rights (paragraphs A.1(a) and (l), and the same paragraphs in each Class).
- It asks whether the house is on Article 2(3) land: a conservation area, National Park, National Landscape, the Broads or a World Heritage Site. Several rights are removed or narrowed there (paragraphs A.2, AA.1(b), B.1(f), E.2, E.3 and G.1(c)).
- It asks about listing, and about any Article 4 direction or planning condition that removes rights, which it cannot check for you.
- It then tests each limit that applies to your kind of project, in the order the Order sets them out, and names the paragraph for each result.
- It lists the conditions the work must meet, such as matching materials, and obscure glazing in upper-floor side windows.
- It draws your project against the limits, to scale.
- It says what would give you certainty: a lawful development certificate, the council's binding confirmation that the work is lawful, or for the larger home extension scheme and extra storeys, the council's prior approval before work starts.
Key rules
Permitted development rights under Part 1 of Schedule 2 to the General Permitted Development Order 2015 belong to houses; flats and maisonettes do not have them (article 2(1)). The limits are measured from the original house: the house as first built, or as it stood on 1 July 1948 if it was built before then.
- A single-storey rear extension may project up to 3 metres beyond the rear wall of the original house, or 4 metres for a detached house, and be no more than 4 metres high (Class A, paragraph A.1(f)).
- Under the larger home extension scheme, a single-storey rear extension may project up to 6 metres, or 8 metres for a detached house, with the council's prior approval. The scheme is not available on Article 2(3) land or a Site of Special Scientific Interest (paragraphs A.1(g) and A.4).
- A rear extension of more than one storey may project up to 3 metres, and may not be within 7 metres of the boundary opposite the rear wall of the house (paragraph A.1(h)).
- Within 2 metres of a boundary of the curtilage, the eaves of a Class A extension may be no higher than 3 metres (paragraph A.1(i)).
- A side extension must be single storey, no more than 4 metres high and no wider than half the width of the original house (paragraph A.1(j)).
- No Class A extension may extend beyond the principal elevation, or a side elevation fronting a highway (paragraph A.1(e)).
- Buildings other than the original house may cover no more than half of the curtilage (paragraphs A.1(b) and E.1(b)).
- Class AA allows up to two extra storeys on a house of two or more storeys, or one on a house of one storey, built between 1 July 1948 and 28 October 2018. The roof may rise by no more than 7 metres or 3.5 metres respectively, and prior approval is always needed (paragraphs AA.1(c), AA.1(f) and AA.2(3)).
- A Class B roof enlargement may add no more than 40 cubic metres to a terraced house, or 50 cubic metres to any other house (paragraph B.1(d)). A dormer must be set back, so far as practicable, at least 0.2 metres from the eaves (paragraph B.2(b)(i)(bb)).
- A rooflight under Class C may protrude no more than 0.15 metres from the roof slope (paragraph C.1(b)).
- A Class D porch may have a ground area of up to 3 square metres, be no more than 3 metres high, and have no part within 2 metres of a boundary with a highway (paragraph D.1).
- A Class E outbuilding must be single storey, with eaves no higher than 2.5 metres and a maximum height of 4 metres for a dual-pitched roof or 3 metres for any other. Within 2 metres of a boundary, its maximum height is 2.5 metres (paragraph E.1).
- A new or replaced hard surface over 5 square metres between the principal elevation and a highway must be porous, or drain to a permeable area within the curtilage (Class F, paragraph F.2).
- A chimney, flue or soil and vent pipe under Class G may not rise 1 metre or more above the highest part of the roof (paragraph G.1(b)).
Article 2(3) land is a conservation area, a National Park, a National Landscape, the Broads or a World Heritage Site. On it, side extensions, rear extensions of more than one storey, roof enlargements and cladding are not permitted development (paragraphs A.2 and B.1(f)). An Article 4 direction or a planning condition can remove these rights. A lawful development certificate is the council's binding confirmation that proposed work is lawful.